01
Model hub
IFC loading, future Fragments persistence, fast selection workflows, and BIM-specific visualization tools.
scan2bim
BIM workspace for models, plans, and review flows
Models. Drawings. Decisions.
scan2bim combines IFC models, PDFs, and project artefacts in a focused operating layer for coordination, QA, review topics, and future That Open viewer workflows.
Command deck
Model stream
Campus_A.ifc
Topics
18
7 unresolved, 4 viewpoints
Sheets
42
linked to model zones
Validation
IDS checks
Run structured QA before release packages move to review.
Coordination
Issue loops
BCF topics connect screenshots, viewpoints, and accountable teams.
Documents
Plan overlays
Link drawings, PDFs, and derived artefacts to spatial context.
Workspace shell
The product surface is designed like an operations room: strong hierarchy, quiet panels, and fast access to the model, the plan set, the review backlog, and building metadata.
01
IFC loading, future Fragments persistence, fast selection workflows, and BIM-specific visualization tools.
02
Plan PDFs, derived exports, and artefact bundles live beside the model instead of in disconnected silos.
03
IDS validation, BCF topics, viewpoints, and future approval flows form one traceable review chain.
04
Structured metadata turns isolated deliverables into a searchable operational memory for each building.
Operational flow
The first release does not pretend to solve every BIM problem. It focuses on a precise chain from ingest to review, so the viewer and document layer can mature on a stable backbone.
Step 1
Bring IFC models, plan sets, and package context into a project workspace.
Step 2
Parse geometry, expose metadata, and prepare future Fragments-backed runtime access.
Step 3
Attach validation, viewpoints, and issues directly to model and document context.
Step 4
Turn reviewed data into a persistent building workspace for future delivery cycles.
Release modules
Rails page foundation for the future That Open model viewer, selection tools, and measurement workflows.
Structured storage for IFC, PDFs, and later derived Fragments or validation reports.
BCF topics, IDS checks, viewpoints, and decision logs connected to geometry and sheets.
Next implementation move
The visual system is now in place. The next logical slice is a real project workspace with uploaded sample assets, a viewer mount point, and the first artefact data model.